A good turnout this morning with 22 members turning out to help with the maintenance around the club.
The bottom of the white dory was cleaned in preparation or the hole to be repaired.
The new steps built by Nick Colbeck were put into place after paving slabs were placed at their foot.
Lights have been put under the galley cupboards and heaters wired into the clubroom.
A great start has been made at demolishing the start box. (A medal should go to Jeff Marshall for his work in removing a rather smelly WC pan.)
A start has been made at removing vegetation from the island between buoys 1 and 2.